2024-03-12 Test Plan, Staff Meeting, Manufacturing Engineering Support

Test Plan Status Update:

  • Communicated status of Test Plan revision in work given updated production flight hardware, fitting geometry, and new fitting testing
  • Next step of action after test plan is complete is to work on test procedure for respective fittings
  • Keeping open line of communication between Structural Engineering regarding technical requirement definition and test plan implementation

Staff Meeting:

  • Attended a staff meeting regarding the structural testing team regarding general testing of aircraft components

Manufacturing Engineering Support:

  • Provided some Manufacturing Engineering support given manufacturing info / processes based on technical drawing of tube

Technical Conflict – Taking over as RTE of Fitting Static Testing as a Manufacturing Engineer / Product Design Engineer

  • Challenges included:
  • Familiaring self with newer standards, new manufacturing techniques, structures testing principles
  • Working with supply chain and manufacturing to design and fabricate a self reacting test structure
  • Writing test plans and procedures (with no prior experience) – integrating things like Instrumentation (LCS/DAS, Load Cells, LVDTs, SGs, Moog Controllers), Hydraulics (Cylinders & Actuators ~100 Kips)
  • Writing respective test and assembly work instructions to ensure DFM regarding test assembly and flight assembly
  • Working with Structural Engineering to meet challenging testing requirements for military aircraft