2024-03-18 Test Plan Send to Stakeholders and Machine Drawings

Test Plan

  • Reviewed test plan and send to stakeholders such as Structural Engineering, Instrumentation Engineering, Mechanical Design, and Mechanical Test Lead

Machine Drawings

  • Review 2nd iteration of initial release of 2D Machined Component CAD Drawings to product Machined Static Test Components
  • Implemented cost savings solutions through best Geometric Dimensioning and Tolerancing standards and implementations

Discussed the development of increasing hydraulic line capabilities for in house lab

Research Instron Lab Testing Machined for Testing Capabilities

Discussed flight hardware geometry requirements and integration of respective geometry into testing

  • Supported Damage Durability Testing through providing required geometry for test hardware
  • Reviewing model constraints to ensure model accuracy