2024-03-21 Test Procedure
Test Procedure for new Fitting Testing
Test Procedure for new Fitting Testing
Machine Design work for Static Testing Layout Document review
Modified thread length to be representative of what we get in real life from supplier bolting (McMaster). McMaster bolt drawings are not very representative of what we get in real life due to stuff like varying thread and grip length. Even had to get supplier to measure thread length so that we know if we … Read more
Test Plan Machine Drawings Discussed the development of increasing hydraulic line capabilities for in house lab Research Instron Lab Testing Machined for Testing Capabilities Discussed flight hardware geometry requirements and integration of respective geometry into testing
Test Plan Status Update: Staff Meeting: Manufacturing Engineering Support: Technical Conflict – Taking over as RTE of Fitting Static Testing as a Manufacturing Engineer / Product Design Engineer
Finished updating the test plan to add fitting instrumentation requirements
Updating Test Plan per updated technical requirement definition includes:
Updated test plan and defined loading requirements for crash case About the author Kazuyoshi Fujimoto, PEPrincipal Mechanical Engineer Kazu performs consulting work regarding Oil & Gas, Automotive, and Aerospace & Defense. Kazu is licensed as a professional engineer in the state of California and has 9+ years of experience in Oil & Gas, Automotive, and … Read more
Test Plan Tooling Tracking Hardware NC Tag Dispositioning
Compared required updates regarding reviewing technical documentation such as Test Requirement Document and Test plan. Summary of changes to implement in revising test plan include: Recently received some updated Test Requirement Definition from Structural Analysis Group. At a high level, updated requirements include defining usage of: About the author Kazuyoshi Fujimoto, PEPrincipal Mechanical Engineer Kazu … Read more