  • 2024-05-02 Design Review and Manufacturing Engineering Support
    Prepping for Critical Design Review on Static Tests Provided Manufacturing Engineering support on build up on an Engineering Development Unit Prototype – provided guidance on assembly parts, processes, and test requirements
  • 2024-04-11 Test Procedure
    Learned something interesting about loading assumptions. Why for testing, we will only pull at a certain value, say NDD at 115% then back off vs. holding it for a long period of time. For aircraft loading and testing: “you’re not trying to show that you can hold the load and the part doesn’t yield. I … Read more
  • 2024-04-08 Visual Aid Instructions
    Visual Aid Instructions
  • 2024-04-09
  • 2024-04-02 Test Procedure and Test Plan
    Further progress on completion of test procedures and test plans
  • 2024-04-01 Test Procedure Common Product Lifecycle Management
    Test Procedure
  • 2024-03-28 Test Procedure Program Requirements
    Test Procedure Test Plan Critical Design Review (CDR)
  • 2024-03-26 Visual Assembly Drawing
    Visual Assembly Drawing for Flight and Test Assemblies
  • 2024-03-25 Test Procedure
    Test Procedure Updates Discussed integration of my load train into other static tests Discussed need for load cell calibration and needing to factor that into schedule to meet program objectives
  • 2024-03-22 Load Train Communication
    Load Train Communication
  • 2024-03-21 Test Procedure
    Test Procedure for new Fitting Testing
  • 2024-03-20 Machine Design
    Machine Design work for Static Testing Layout Document review
  • 2024-03-19 CAD Design Changes to Static Test Configs
    Modified thread length to be representative of what we get in real life from supplier bolting (McMaster). McMaster bolt drawings are not very representative of what we get in real life due to stuff like varying thread and grip length. Even had to get supplier to measure thread length so that we know if we … Read more
  • 2024-03-18 Test Plan Send to Stakeholders and Machine Drawings
    Test Plan Machine Drawings Discussed the development of increasing hydraulic line capabilities for in house lab Research Instron Lab Testing Machined for Testing Capabilities Discussed flight hardware geometry requirements and integration of respective geometry into testing
  • 2024-03-12 Test Plan, Staff Meeting, Manufacturing Engineering Support
    Test Plan Status Update: Staff Meeting: Manufacturing Engineering Support: Technical Conflict – Taking over as RTE of Fitting Static Testing as a Manufacturing Engineer / Product Design Engineer
  • 2024-03-11 Test Plan Update Completion
    Finished updating the test plan to add fitting instrumentation requirements
  • 2024-03-08 Test Plan Updates – Instrumentation Implementation
    Updating Test Plan per updated technical requirement definition includes:
  • 2024-03-07 Test Plan Updates
    Updated test plan and defined loading requirements for crash case About the author Kazuyoshi Fujimoto, PEPrincipal Mechanical Engineer Kazu performs consulting work regarding Oil & Gas, Automotive, and Aerospace & Defense. Kazu is licensed as a professional engineer in the state of California and has 9+ years of experience in Oil & Gas, Automotive, and … Read more
  • 2024-03-06 Test Plan Updates and Tooling Tracking
    Test Plan Tooling Tracking Hardware NC Tag Dispositioning
  • 2024-03-04 Test Plan Updates
    Compared required updates regarding reviewing technical documentation such as Test Requirement Document and Test plan. Summary of changes to implement in revising test plan include: Recently received some updated Test Requirement Definition from Structural Analysis Group. At a high level, updated requirements include defining usage of: About the author Kazuyoshi Fujimoto, PEPrincipal Mechanical Engineer Kazu … Read more